- Layout is marked as per the drawing, using 5 dimensional laser machine for accurate plumb & right angle, maintaining all levels.
-
Top and bottom channels are placed with the help of laser alignment, verticality is being checked & installed, fixing anchor bolts and tightened with drill. -
Cut panel is being erected manually and slided in top & bottom channel and brought at the location. -
All joints are well filled with compound and mesh tape is pasted on all joints of panel and panel structure joints. -
Mesh tape is later finished with non-shrink non-crack compound.
Process till completion
E-Bonding agents for Gypsum Finishing
Drilling
Concealed plumbing
Custom architectural work
Concealed electrical work
Sanitary fittings and fixtures
Conduit
Flooring
Panting
Tiling
Properties
PARTICULARS | REMARKS | 50 MM | 75 MM | 100 MM |
---|---|---|---|---|
Size | mm | 600x3000 / 2400 | 600x3000 / 2400 | 2400x600 |
Thickness | mm | 50 | 50 | 100 |
Density | Kg/m3 | 850 Kg/m | 850 Kg/m | 850 Kg/m |
Standard Weight | Kg per sqm | 50 Kg | 75 Kg | 85 Kg |
Water Absorption | % | Less than 15% | Less than 15% | Less than 15% |
Neil Holding Capacity | Kgs per nail | 15 kg/ Nail | 18 kg/ Nail | 22 kg/ Nail |
Moisture Resistance | - | No Dampness | No Dampness | No Dampness |
Combustibility | - | Not Combustible | Not Combustible | Not Combustible |
Fire Resistance | Rating | More than 2 hours | More than 2 hours | More than 2 hours |
Axial Load per meter | KN/m | 50 | 88 | 105 |
Sound Transmission | db | 40 | 42 | 44 |
Thermal Conductivity | BS4370_Part2 | 0.24 | 0.21 | 0.19 |